After page applying diagram-design (cathrynlavery/diagram-design) to the shared before. Kanban type, full editorial variant, default skin.

Kanban · Northline weekly ops

Harbor is the one card that is stuck

A state census of this week's threads, not a flow. No connectors, just where each thread sits. Fourteen threads wait on us, two accounts are active, and Harbor and Co has been blocked for nine days since the price change.

Northline weekly ops · Kanban Kanban board of Northline's weekly ops threads across waiting-on-us, active, waiting-on-reply, and done columns, with Harbor and Co blocked for nine days. Waiting on us Active accounts Waiting on reply Done 14 2/2 1/3 1 Revised PO from Harbor EMAIL · TUE 9:14AM · ada Harbor follow-up note DRAFT · UNSENT · ada +12 more threads QUEUE · 14 WAITING ON US Harbor and Co $18,400 · −12% · STALE 9D Field notes $1,050 · +1% · GROUP · WARM Ada Okonkwo $6,200 · +4% · DM · PENDING Boston plant intro DONE · YESTERDAY · ada LEGEND Default Blocked Waiting / external Done

BLOCKED · FOCAL

Harbor and Co · $18,400

Last touch was nine days ago, the amount moved down 12%, and the thread is still marked blocked. The follow-up is already drafted: "Thanks for the update. Can you send the revised PO by Thursday?" A short note beats another status meeting.

Waiting on reply · 1/3

Ada Okonkwo is moving (+4%, $6,200) but the next step is hers. Track it apart from work we can push.

Pipeline · $42.6k

128 open threads, 14 waiting on us. Done shows one entry; older completions roll off the board.

Reach Harbor: Telegram (@harborco) · text the plant (+1 617 555 0198). Owner: Ada. Assumptions (no reviewer reachable): default style-guide skin kept; the Urgent table, Pending list and KPIs were merged into one board; filter chips and the empty state were dropped because a state census has no filters.

Powered by Vibe Rooster